Projects: Griffins Dough Room Ingredients Delivery
Griffins Dough Room Ingredients Delivery
TEG provided project engineering from concept through to final commissioning of the Dough Room and Ingredients Delivery.
- 7 horizontal jacketed mixers
- Flour silo and flour reticulation
- Sugar silo and sugar
- Water delivery
- Melted fat system
- including steam, chilled water, hot water, potable water
- Total project value was $ 4.0m
Results
The project was delivered on time and achieved the required benefits. A highly automated ingredients delivery system that allowed efficient mixing processing on six production lines has been installed.