Objective

TEG Risk were commissioned to facilitate Machinery Risk Assessments (MRA’s) in accordance with AS4024 on equipment at the Lion East Tamaki site. 

The study involved the identification of all the hazards that may be encountered throughout the operating life-cycle of the machine and evaluating the level of risk, the required risk reduction category and identifying what further actions were required to ensure ‘All Practicable Steps’ have been taken.

Results

The Machine Risk Assessment process delivered to the client a risk register which has enabled a capital works programme to address the risks with interim or final control measures.